Get in while the building is still being designed.
A lift shaft is cast into the structure. So is the fire-fighting riser and the plant room. Lifts, fire systems and HVAC shape the drawings, which means they are decided early and installed mid-build. Larger plots and commercial use are the strongest signals.
Who decides
Specified early, installed mid-build.
Systems are usually chosen in the first three months and installed from around month 5 to month 12. Miss the first three months and you are selling against a drawing that already names someone else. Indicative; every site differs.
| Trade | Specified | Purchased |
|---|---|---|
| Building materials | months 0 to 1 | months 1 to 8 |
| Equipment and machinery | no specification stage | months 0 to 9 |
| Site services and compliance | no specification stage | months 0 to 4 |
| MEP and building systems | months 0 to 3 | months 5 to 12 |
| Hardware and fittings | months 0 to 3 | months 7 to 14 |
| Woodwork and joinery | months 1 to 4 | months 7 to 15 |
| Interiors and finishes | months 2 to 7 | months 10 to 17 |
How systems suppliers use Supercrete.
Lift-likely sites
Stilt-plus-four rebuilds commonly include a lift. Filter by plot size and use to find them as soon as they appear.
Commercial pipeline
Commercial and mixed-use projects, where HVAC and fire systems are larger and decided earlier.
Public buildings, early access
Schools, hospitals and offices won by contractors, through awards intelligence.
use: commercial, mixed useplot ≥ 400 m²new ≤ 90 daysCommon questions
Can I see the number of floors?
Building use and plot area are shown today. Floor counts are not.
Which professionals matter most?
Architects choose and design around systems. Profiles show who designs the larger and commercial buildings in each area.
Do you cover MEP consultants?
The key stakeholders behind each project, such as architects and structural engineers, are covered today. Other consultants are not.